While the exact path to an extensive

upgrade of existing building stock is yet to

be determined, we can select a particular

scenario to illustrate the magnitude of the

task. The scenario requires:

• Minimal-Intervention Buildings: Retro-

commissioning 30% of existing

buildings – with the target of reducing

BSI consumption by 10%

• Full Intervention Buildings: Retro-

commission and retrofit 70% of existing

buildings – with the target of reducing

BSI consumption by 35% compared

to 2012 codes (55% enhancement

from an average commercial building

consumption in 2005)

0

50

100

150

200

250

300

350

35% Reduction

Average building in 2005

Minimal-Intervention Commercial Building

Full-Intervention Commercial Building

retrofitted to BEC 2012

Lighting system (40%)

Air-side system (30%)

Water-side system

(30%)

Chiller system (40%)

Lifts and escalators system (10%)

Other systems*

(25%)

55% Reduction

Building Services Installation EUI

[kWh/sqm]

Remark: Bracketed percentage refers to increase in efficiency to that specific system through equipment specifications and enhanced

controls/operation

*Other systems include: Centralised hot water, Pumping, Mechanical ventilation, etc.

Beyond BEC 2012