3. Green School Guide - 3.3 Energy Saving
Hong Kong Green Building Council
99
• The structural loading capacity of roof in normal schools shall be able to
withstand the weight of wind turbine. However, Authorised Person (AP) and
Registered Structural Engineer (RSE) shall be consulted;
• Additional concrete footing for wind turbine installation can help prevent
vibration issue and avoid invasive bolting on roof surface which might lead to
water seepage issue at a later stage;
• Wind turbine installation shall be carried out by renewable energy system
suppliers; and
• Electrical components installation (e.g. DC AC converter, transformer,
controls) shall be carried out by Registered Electrical Contractor & Registered
Electrical Worker.
d. Professional Help
• Authorised Person (AP) & Registered Structural Engineer (RSE) – Appendix
A (2)
• Registered Professional Engineer (RPE) – Appendix A (4)
• Renewable Energy System Suppliers – Appendix B (6) & (7)
• Registered Electrical Contractor & Registered Electrical Worker – Appendix
B (4)
Cost Information
The costs for installation and maintenance vary and depend:
• Complexity of current electrical wiring;
• Wind availability on site; and
• Maintenance/installation access.
School can contact professionals provided in Appendix A (2) and renewable
energy system suppliers provided in Appendix B (6) (7) for cost and options.
Indicative cost is provided in Appendix F for general reference.