Private Sector Taikoo Place Re-development Phase 2A
Projects

Sustainability in the context of today’s building the whole team being aware of their Excellent cross-team coordination work
markets has taken on a holistic nature, where responsibilities during each stage of the was important for the project to achieve an
many different disciplines are required to building life cycle. To achieve this exemplary integrated development approach. Starting
interact towards achieving a triple bottom cross-team performance, it is necessary to from the early design stage, the TKP2A project
line, i.e. favourable environmental, social and develop effective means of communicating team together with the building operational
economic outcomes. This means that design environmental parameters. This is achieved team (TPMO) and the sustainability team
decisions can no longer be made in isolation, through Building Environmental Modelling, (TSSD) were involved in the tower 2A design.
but must rather consider the impact on many which analyses various aspects and presents With regular communication, the project
fields in order to attain efficiencies and build them on a 3D visual platform. team was able to refine its understanding
high-performance sustainable buildings. of the design considerations based on
Tai Koo Place Re-development Phase 2 A experiences of other building operations in
Every aspect of environmental performance (TKP2A) is a new 47-storey Grade A office order to develop an ultimate building design
must be monitored throughout the building tower with a gross floor area (GFA) of around for future tenants’ and occupants’ needs.
life cycle, from computational modelling 90,000 m2. Owned by Swire Properties, it is The operational and sustainability teams
during the concept and design stages, to being transformed from Somerset House in also shared the energy performance data
specifications and implementation during Taikoo Place in Island East, Hong Kong. The of existing buildings in Taikoo Place, such
the construction stages, to measurement project started in 2012 and is targeted to as Somerset House, One Island East, and
and verification during the operation stage. be occupied in 2018. The key objectives of Dorset House, to identify energy benchmarks
No single discipline alone can provide TKP2A is to develop a best-in-class, green and the actual performance of various green
an exemplary outcome in all aspects of and sustainable building from design, to strategies. This helped the project team
environmental performance. Hence, the construction to operation, as an exemplar determine the most suitable solution for
design of high-performance buildings of a high-performance sustainable high-rise TKP2A.
is an integrated design process, where building in Hong Kong.
performance goals are agreed upon, with

PROJECT SCALE / USE 0.64 hectare
90,000 m2
Site area (approx.) 47 (41 office floors, mechanical and refuge floors)
Gross floor area (approx.) 9,000
Number of floor above grade Office tenant
Approximate final population
Key Occupancy type(s)

192 HONG KONG REPORT ON THE STATE OF SUSTAINABLE BUILT ENVIRONMENT 2014