Public Sector Salt Water Supply for
Projects the North West New Territories
Seawater is already available for toilet The construction works are being In 1955, the Government started its first
flushing in metropolitan areas and most of implemented under nine works contracts, pilot scheme to use seawater for toilet
the new towns in Hong Kong, covering about with the first one commencing in October flushing, but this was not welcomed by flat
80 percent of the population. At present, 2008. The construction of the service reservoir owners at that time because of the high cost
though, the North West New Territories commenced in January 2010 and was involved in retrofitting existing buildings.
(NWNT), except Tuen Mun New Town, is substantially completed in November 2013, The atmosphere, however, changed in
currently supplied with temporary mains while that of the pumping station commenced 1963-1964 when Hong Kong experienced its
fresh (TMF) water for flushing. A review of in February 2010 for target completion in worst drought in history, with water supplied
the flushing water supply in NWNT concluded August 2014. The overall construction works to the public for only four hours in every four
that it would be more cost-effective to use are expected to be completed by the end of days for a whole year, resulting in a serious
salt water for flushing. The Water Supplies 2014. After completion of the construction economic downturn. In the 1960s, new
Department (WSD) therefore proposed to works, conversion works will be conducted in legislation was passed requiring all newly
replace the current supply of TMF with a stages to introduce the salt water supply for built private buildings to be equipped with
salt water supply system in NWNT to save toilet flushing. water flushing facilities, which included a
precious fresh water and provide a more separate flushing system, drainage pipes for
economical flushing water source. The history of using seawater for toilet waste, toilets and flushing cisterns. Since
flushing in Hong Kong can be traced back to then, the percentage of coverage by the
The project aims to provide a seawater the 1950s when Hong Kong started to use system has gradually increased.
supply for toilet flushing in Tin Shui Wai, Yuen water closets to improve sanitary conditions.
Long Town, and the Yuen Long – Tuen Mun
Corridor, the eastern part of Tuen Mun New PROJECT SCALE / USE The new salt water supply system under the project requires
Town and Tuen Mun East areas, all of which Site area (approx.) the construction of a seafront salt water pumping station
are located in NWNT. The new salt water Gross floor area (approx.) with capacity of 83MLD at Lok On Pai, a salt water service
supply system requires the construction of Number of floor above grade reservoir with size of 18,100m3 at Tan Kwai Tsuen, an
a seafront salt water pumping station with intermediate booster chlorination plant at Tuen Mun Water
a capacity of 83 million litres per day at Lok Approximate final population Treatment Works and laying of approximately 16.8km of
On Pai, a salt water service reservoir with Key Occupancy type(s) associated salt water mains ranging from 300 to 1,000 mm
a size of 18,100 m3 at Tan Kwai Tsuen, an in diameter.
intermediate booster chlorination plant at
Tuen Mun Water Treatment Works, and the Estimated population of 696,000 will be served by the new
laying of approximately 16.8 kilometres of salt water supply system for toilet flushing
associated salt water mains ranging from 300
to 1,000 mm in diameter. N/A
126 HONG KONG REPORT ON THE STATE OF SUSTAINABLE BUILT ENVIRONMENT 2014
Projects the North West New Territories
Seawater is already available for toilet The construction works are being In 1955, the Government started its first
flushing in metropolitan areas and most of implemented under nine works contracts, pilot scheme to use seawater for toilet
the new towns in Hong Kong, covering about with the first one commencing in October flushing, but this was not welcomed by flat
80 percent of the population. At present, 2008. The construction of the service reservoir owners at that time because of the high cost
though, the North West New Territories commenced in January 2010 and was involved in retrofitting existing buildings.
(NWNT), except Tuen Mun New Town, is substantially completed in November 2013, The atmosphere, however, changed in
currently supplied with temporary mains while that of the pumping station commenced 1963-1964 when Hong Kong experienced its
fresh (TMF) water for flushing. A review of in February 2010 for target completion in worst drought in history, with water supplied
the flushing water supply in NWNT concluded August 2014. The overall construction works to the public for only four hours in every four
that it would be more cost-effective to use are expected to be completed by the end of days for a whole year, resulting in a serious
salt water for flushing. The Water Supplies 2014. After completion of the construction economic downturn. In the 1960s, new
Department (WSD) therefore proposed to works, conversion works will be conducted in legislation was passed requiring all newly
replace the current supply of TMF with a stages to introduce the salt water supply for built private buildings to be equipped with
salt water supply system in NWNT to save toilet flushing. water flushing facilities, which included a
precious fresh water and provide a more separate flushing system, drainage pipes for
economical flushing water source. The history of using seawater for toilet waste, toilets and flushing cisterns. Since
flushing in Hong Kong can be traced back to then, the percentage of coverage by the
The project aims to provide a seawater the 1950s when Hong Kong started to use system has gradually increased.
supply for toilet flushing in Tin Shui Wai, Yuen water closets to improve sanitary conditions.
Long Town, and the Yuen Long – Tuen Mun
Corridor, the eastern part of Tuen Mun New PROJECT SCALE / USE The new salt water supply system under the project requires
Town and Tuen Mun East areas, all of which Site area (approx.) the construction of a seafront salt water pumping station
are located in NWNT. The new salt water Gross floor area (approx.) with capacity of 83MLD at Lok On Pai, a salt water service
supply system requires the construction of Number of floor above grade reservoir with size of 18,100m3 at Tan Kwai Tsuen, an
a seafront salt water pumping station with intermediate booster chlorination plant at Tuen Mun Water
a capacity of 83 million litres per day at Lok Approximate final population Treatment Works and laying of approximately 16.8km of
On Pai, a salt water service reservoir with Key Occupancy type(s) associated salt water mains ranging from 300 to 1,000 mm
a size of 18,100 m3 at Tan Kwai Tsuen, an in diameter.
intermediate booster chlorination plant at
Tuen Mun Water Treatment Works, and the Estimated population of 696,000 will be served by the new
laying of approximately 16.8 kilometres of salt water supply system for toilet flushing
associated salt water mains ranging from 300
to 1,000 mm in diameter. N/A