Pre-cast elements, such as pre-cast façades, been adopted at all levels of the project, KEY TEAM MEMBERS
partitions, walls, bathrooms (Volumetric including recycled pervious paving blocks in
Precast Bathroom) and staircases are external areas, recycled plastics for outdoor Owner / Developer
maximised, and acrylic paint in lieu of wall landscape furniture and decking, use of low Hong Kong Housing Authority
tilling on external walls is used. There is a VOC emission acrylic paint, use of pulverised
permeable landscaped deck on the first floor Fuel Ash in concrete, and use of Ground Project Manager / Architect /
to help reduce the heat island effect and Granulated Blastfurnace Slag (GGBS) to C&S Engineer / M&E Engineer /
to improve air ventilation. Suitably located partially replace cement in precast concrete Landscape Architect /
windows are provided at typical floor lobbies façades. Lastly, trees of local species found in Quantity Surveyor
and corridors for effective ventilation. Tung Chung have been planted for educational Development and Construction Division,
Environmentally friendly materials have also purposes. Housing Department,
HKSAR Government

Sustainable Design Consultant
Business Environment Council

Main Contractor
Hsin Chong Construction Co. Ltd.

HONG KONG REPORT ON THE STATE OF SUSTAINABLE BUILT ENVIRONMENT 2014 113