Page 142 - The Hong Kong Green Building Council (HKGBC) 香港綠色建築議會
P. 142
Public Sector Ex-Yuen Long Estate
Projects

Located at the north of Yuen Long Town Centre, Embracing a caring attitude to foster
the public rental housing development at the social and environmental sustainability,
reduced site of the Ex-Yuen Long Estate will the project’s low-carbon building design
provide 438 flats in 2016 for approximately aims to create a green, cost effective and
1,200 people in two domestic blocks. The healthy living environment in a small and
small, elongated site is about 0.43 hectare, compact development. It is an exemplary
bounded by heavily trafficked roads on three demonstration of sustainable public housing
sides. Apart from the emissions impact from design in a high-density urban living
the adjacent factory buildings, the site layout environment, attributable to the balanced use
is subject to nuisance due to the elevated of green technologies.
MTR viaduct of Long Ping Station. Like many
residential developments in the urban area,
the site also lacks open space and is subject
to complex geotechnical constraints as it
lies within both the Scheduled Area No. 2
(North West New Territories) and Scheduled
Area No. 3 (railway protection areas). Ground
investigation information reveals that the site
is underlain by interbedded layers of hard and
soft materials from approximately 20 metres
to 130 metres deep.

PROJECT SCALE / USE 0.43 hectare
Site area (approx.) 21,000 m2 (domestic) and 900 m2 (non-domestic)
Gross floor area (approx.) Block 1: 19, Block 2: 30
Number of floor above grade 1,200
Approximate final population Public Rental Housing
Key Occupancy type(s)

140 HONG KONG REPORT ON THE STATE OF SUSTAINABLE BUILT ENVIRONMENT 2014
   137   138   139   140   141   142   143   144   145   146   147