Green building design was thoroughly adopted the flooding risk as well. The cost saving KEY TEAM MEMBERS
in the project. The proposed fan room and alternative design has reduced the time
pump house are surrounded by green sports and cost of construction, as well as public Owner / Developer
pitches. To allow a better blend of the two nuisance and use of resources. The WHS Drainage Services Department,
new structures with the environment, a ‘cave contributes to the beneficial reuse of water. HKSAR Government
with a green lawn on top’ design concept is The movable weir design promotes energy
being adopted. The whole pump house is to savings. Last but not the least, the green Project Manager
be sheltered under a green soft blanket of building design provides green and leisure Chief Engineer / Drainage Projects,
lawn with sloping ground serving as a sitting space to the public. The HVUSSS provides Drainage Services Department,
area for the public while also providing good a sustainable solution that addresses both HKSAR Government
thermal insulation for the pump house. the needs for cost effective flood alleviation
and improvements to the quality of life for Architect
This project is a showcase of positive members of the public. Ivanho Architect Ltd.
sustainable design in Hong Kong. Its
innovative flood control design will reduce C&S Engineer
Drainage Projects Division,
Drainage Services Department,
HKSAR Government

M&E Engineer
Electrical And Mechanical Projects Division,
Drainage Services Department,
HKSAR Government

Landscape Architect
ADI Ltd.

Main Contractor
Chun Wo Construction & Engineering Co.,
Ltd.