Page 105 - The Hong Kong Green Building Council (HKGBC) 香港綠色建築議會
P. 105
KEY TEAM MEMBERS
Air-conditioning and Lift and Escalator Installation Owner / Developer
Mechanical Ventilation Installation • Use of service-on-demand escalators. Director of Administration, Chief Secretary
for Administration's Office,
• Use of highly energy-efficient direct HKSAR Government
seawater cooled chiller plant; Water Saving Provisions Project Manager
Architectural Services Department,
• Adoption of energy recovery systems, • Use of dual-volume cisterns for toilet HKSAR Government
including heat recovery chillers, energy flushing to save water;
wheel, etc.; Architect
• Use of variable speed driven • Infrared sensors for water tap and urinals; Rocco Design Architects Ltd.
air-conditioning equipment, such as and
• Reuse of condensing seawater from the C&S Engineer
chillers, water pumps, fan motors; Meinhardt (C&S) Ltd.
• Free cooling design by full use of outside central chiller plant for toilet flushing.
M&E Engineer
air; J. Roger Preston Ltd.
• Occupancy sensor controls for the Landscape Architect
air-conditioning supply; HOK International (Asia/ Pacific) Ltd.,
ADI Ltd.
• Temperature-controlled mechanical
ventilation in plant rooms; Quantity Surveyor
Langdon & Seah Hong Kong Ltd.
• Intelligent energy optimisation controls
for the air-conditioning system, such as Sustainable Design Consultant
temperature reset, static pressure reset, Connell Wagner/ Aurecon Hong Kong Ltd.
etc.;
Environmental Consultant
• Carbon dioxide monitoring sensors to ERM-Hong Kong, Ltd.
control fresh air supply;
Façade Consultant
• Automatic condenser tube cleaning system ALT Ltd.
for the central chiller plant; and
Acoustic Consultant
• Collection of condensate water for fresh air Wilkinson Murray (HK) Ltd.
pre-cooling.
Main Contractor
Gammon - Hip Hing Joint Venture
HONG KONG REPORT ON THE STATE OF SUSTAINABLE BUILT ENVIRONMENT 2014 103
Air-conditioning and Lift and Escalator Installation Owner / Developer
Mechanical Ventilation Installation • Use of service-on-demand escalators. Director of Administration, Chief Secretary
for Administration's Office,
• Use of highly energy-efficient direct HKSAR Government
seawater cooled chiller plant; Water Saving Provisions Project Manager
Architectural Services Department,
• Adoption of energy recovery systems, • Use of dual-volume cisterns for toilet HKSAR Government
including heat recovery chillers, energy flushing to save water;
wheel, etc.; Architect
• Use of variable speed driven • Infrared sensors for water tap and urinals; Rocco Design Architects Ltd.
air-conditioning equipment, such as and
• Reuse of condensing seawater from the C&S Engineer
chillers, water pumps, fan motors; Meinhardt (C&S) Ltd.
• Free cooling design by full use of outside central chiller plant for toilet flushing.
M&E Engineer
air; J. Roger Preston Ltd.
• Occupancy sensor controls for the Landscape Architect
air-conditioning supply; HOK International (Asia/ Pacific) Ltd.,
ADI Ltd.
• Temperature-controlled mechanical
ventilation in plant rooms; Quantity Surveyor
Langdon & Seah Hong Kong Ltd.
• Intelligent energy optimisation controls
for the air-conditioning system, such as Sustainable Design Consultant
temperature reset, static pressure reset, Connell Wagner/ Aurecon Hong Kong Ltd.
etc.;
Environmental Consultant
• Carbon dioxide monitoring sensors to ERM-Hong Kong, Ltd.
control fresh air supply;
Façade Consultant
• Automatic condenser tube cleaning system ALT Ltd.
for the central chiller plant; and
Acoustic Consultant
• Collection of condensate water for fresh air Wilkinson Murray (HK) Ltd.
pre-cooling.
Main Contractor
Gammon - Hip Hing Joint Venture
HONG KONG REPORT ON THE STATE OF SUSTAINABLE BUILT ENVIRONMENT 2014 103