分享成功項目

分享 列印 字體正常 字體放大

本會的鉑金及黃金贊助會員可透過本會網頁,分享綠色建築項目或研究的成功案例,從而令議會的合作 夥 伴、業內及公眾人士進一步認識會員對可持續發展建築的參與和貢獻。

成功案例須符合下列要求:
1. 案例中的主要環保元素,必須與綠建環評最新版本或以往版本所涵蓋的相關範疇。
2. 案例曾獲任何相關綠色建築業獎項,如環保建築大獎。

各贊助級別可享展示案例數目:
鉑金級 - 14個成功案例(包括環保建築項目或研究項目)
黃金級 - 8個成功案例(包括環保建築項目或研究項目)

遞交案例的標準格式
案例須以A4尺寸格式遞交,詳情請按。(只供英文版本)


1-10 / 18 搜尋結果
 / 2

Chilled Beam Technology

A chilled beam system is an air conditioning system for cooling, heating, and ventilation that can be used in places ranging from offices to hospital wardrooms

Rainwater Recycling System

Rainwater is a free, abundant, and natural resource that has the potential to provide an important source of water for irrigation.

39 Conduit Road

DLN Architects Limited     2014年5月22日
The back of the site is a natural slope with lush greenery rising to the top of the mountain, Victoria Peak.

Heya Green

DLN Architects Limited     2014年5月22日
Introduce vertical greening at podium façade, extensive green roof to reduce heat gain, provision of landscaping podium garden

The Gloucester, Hong Kong

DLN Architects Limited     2014年5月22日
It implements an Environmental Passive Green Building Design to respect the local context reduce the environmental load and enhance the living quality in Life Cycle perspective.

Hysan Place, Hong Kong

DLN Architects Limited     2014年5月22日
A BEAM Platinum certified project and first LEED Platinum certified composite vertical mall/ office in the world

Double Cove, Hong Kong

DLN Architects Limited     2014年5月16日
Double Cove development aims to set a high standard of promoting sustainable living within the development as well as for the neighbourhood.

Mount Parker Residences, Hong Kong

DLN Architects Limited     2014年5月16日
The site and its landscape context are characterized by a combination man-made slopes from the northeast and remnants of the original landform descending down to the northwest.

HKUST School of Business & Advanced Study

DLN Architects Limited     2014年5月16日
The building was developed on a Brownfield site.

Azura

DLN Architects Limited     2014年5月13日
The building height of the development is compatible with the existing high-rise buildings such that the existing skyline is respected with the development at the location. A
1-10 / 18 搜尋結果
 / 2